Where has all the copper gone: The stocks and flows project, part 1

From: JOM | Date: October 1, 2002| Author: | Copyright information

Overview

Copper

Analysis of the stocks and flows of anthropogenically important materials can indicate not only how much and for what purpose a material has been used, but also where the reservoirs of materials might be located.

"In the highly developed economies of the future, it is probable that cities will become huge, rich and diverse mines of raw materials."

Jane Jacobs

The Economy of Cities1

The quantitative assessment of stocks and flows of materials throughout the technological cycle, from resource extraction to final disposal, can inform resource policy, environmental science, ...

Related newspaper, magazine, and trade journal articles from HighBeam Research

(Including press releases, facts, information, and biographies)

Materials for 21st Century INFRASTRUCTURE.
; Dale F. Stein [*] Materials such as asphalt, concrete, and composites...roads and bridges. Infrastructure materials largely determine the quality of life...security of the nation. Infrastructure materials are often taken for granted because...
Evolution of Metallic Materials Beyond the Year 2000.
; The progress of certain materials relies heavily on the needs of tomorrow...take place in the application of materials in a period such as the present with...good examples.) The evolution of materials will no doubt be closely linked to...
Assessing the electrostatic suitability of modern materials: are today's ESD test methods up to the challenges presented by modern materials?(ESD TEST)
; The suitability of materials to avoid the risks of and problems...not be appropriate for many modern materials. The Basics Avoiding ESD-related risks...Conductors in Contact The capability of materials to drain charge from a conductor is...
Stay off the fast-rising escalator of commodity prices <> When launching a home project, make sure your contract ensures that you do not overpay for materials
; The materials used to construct a house aren't rare -- wood, steel...6.7%, and diesel fuel, used to transport those materials, was up 5.7% over the past 12 months. Construction materials and components were up 13.2% for the six months...
NMAB defines Materials Research to meet 21st Century Defense Needs, plans review at TMS annual meeting
; Advanced materials offer the potential for the U.S. Department...own health during operation, concludes Materials Research to Meet 21st Century Defense...later this month from the U.S. National Materials Advisory Board (NMAB). To help make...
Managing the flow of materials.
; Managing the flow of materials Like a fluid flowing through a pipeline, or water moving along a river, materials handling in the '90s will increasingly...in some rivers, however, the flow of materials must not be allowed to meander or backtrack...
Morris E. Fine & Peter W. Voorhees: on the evolving curriculum in materials science & engineering.
; In 1950, materials science and engineering did not exist...departments. Specific areas of electronic materials were taught in many different departments...corrosion, mechanical properties, and materials processing were also found in a wide...
Avoid getting burned on materials.(The voice of Experience)
; Avoid getting burned on materials By Roger Cook Prudent planning and...especially when it comes to estimating materials. When you're bidding a job, there...view is extremely difficult. Really, materials covers everything but your labor...
New package materials meet roadblocks; problems are costs, nonstandard manufacturing, say detractors. (includes related article on emerging materials)
; New Package materials meet roadblocks An emerging debate over how to bring new board and IC package materials into the design mainstream has proponents...makers are unwilling to adopt non-standard materials, and Underwriters Laboratories is stalling...
Subcontractors storing project materials handle unique payment concerns.(Communique)
; ...subcontractors that purchase and store materials in advance for their portion of a protect...By contrast, in the case of stored materials, the subcontractor needs to focus on assuring payment for materials that it suitably stores before installation...