|
Ariane 5 cost battle: the abrupt contraction of the commercial launch market is forcing Arianespace and its suppliers into a new round of cost cutting. (Space).
From:
Interavia Business & Technology
| Date:
November 1, 2002| Author:
| COPYRIGHT 2002 Aerospace Media Publishing. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group.Copyright information
|
The failure of the inaugural launch of Ariane 5 with its new ESC-A upper stage comes as a major blow for the European space community. The new variant of the European launcher is designed to loft 10t into geostationary transfer orbit (GTO), compared with 6.9t for the baseline Ariane 5 that has flown until now.
The launch failure--which occurred as we went to press--comes at a critical moment for Arianespace, currently phasing out Ariane 4 (the last one will be launched early next year) and feeling the pressure of a stalling commercial launch market, which has pushed it into ...
Related newspaper, magazine, and trade journal articles from HighBeam Research
(Including press releases, facts, information, and biographies)
|
Getting Ariane back on the rails
; ...plus the ESC-A upper stage powered by the HM-7 engine of Ariane 4), for a performance...engine and the EPS upper stage of today's generic Ariane 5) in September...flight-qualified Ariane 5 GS Generic...Vulcain 1 and EPS upper stage) for a performance...
|
|
Getting Ariane back on the rails: decisions approved at the recent ESA ministerial council meeting, coupled with industrial restructuring, should calm the recent turbulence in the European space sector. (Space).
; ...plus the ESC-A upper stage powered by the HM-7 engine of Ariane 4), for a performance...engine and the EPS upper stage of today's generic Ariane 5) in September...flight-qualified Ariane 5 GS Generic...Vulcain 1 and EPS upper stage) for a performance...
|
|
Playing a key role in the Ariane 5 launcher: MAN Technologie delivered new flight components of the improved Ariane 5 on time for the first launch in 2002. (MAN Technologie).
; ...Cryotechnique) upper stage. MAN Technologie...revamping the Ariane 5's booster...of the first Ariane 5 equipped with the new upper stage has been scheduled...degrees]C. An Ariane 5 equipped with...cryogenic-fueled upper stage receives the...
|
|
Playing a key role in the Ariane 5 launcher
; ...Cryotechnique) upper stage. MAN Technologie...revamping the Ariane 5's booster...of the first Ariane 5 equipped with the new upper stage has been scheduled...250 deg C. An Ariane 5 equipped with...cryogenic-fueled upper stage receives the...
|
|
Ariane 5 cost battle
; ...inaugural launch of Ariane 5 with its new ESC-A upper stage comes as a major...cryogenic ESC-A upper stage would gradually replace the current Ariane 5, which is equipped...third stage) on the Ariane 5 upper stage for the first time...
|
|
New powerplants for Ariane 5.
; ...the upgraded versions of Ariane 5, intended to raise its...end-2001. This will use a new upper stage containing the existing HM-...stage from the third stage of Ariane 4, with minimal changes...Astrium -- is `permanent' upper stage contractor for all Ariane 5 versions and has ...
|
|
ARIANE 5 PLUS DEVELOPMENT ACCELERATES.
; ...million The second phase of Ariane 5 Plus comprises 415 million [European Dollar] for Ariane 5 improvements (coming...extend the financing of Ariane 5 infrastructure, and EE134...Dollar] for the programme Ariane 5 Plus (second phase, including...billion already spent on Ariane 5 over the ...
|
|
New powerplants for Ariane 5
; ...the upgraded versions of Ariane 5, intended to raise its...end-2001. This will use a new upper stage containing the existing HM-...stage from the third stage of Ariane 4, with minimal changes...Astrium - is 'permanent' upper stage contractor for all Ariane 5 versions and has ...
|
|
Overhaul ahead for European space sector: Ariane 5 difficulties accelerate reviews under way at French and European level. (Space).
; ...the failure of the new 10t Ariane 5, ESA decided to postpone...Rosetta probe on a standard Ariane 5, as a precautionary measure...total confidence in the Ariane qualification and review process. The Ariane 5 that would have launched...did not feature the ESC-A upper stage or Vulcain ...
|
|
Issues in space propulsion: Snecma and its partners ensure that Ariane engines deliver required performance and reliability while cutting production costs by 35 %. (Snecma).(Snecma Moteurs and Arianespace develop space launch vehicles)
; ...independent access to space. The Ariane family of launchers is the result...use of cryogenic engines on the upper stage of Ariane 5 will increase its capacity from...new-generation cryogenic engine for the upper stage, Vinci, of a totally different...
|
For more facts and information,
see all results