|
Railway test & Research. (World Market).
From:
International Railway Journal
| Date:
April 1, 2001
| COPYRIGHT 2001 Simmons-Boardman Publishing Corporation. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group.Copyright information
|
Sulzer-Escher Wyss, Germany, has won a DM 13 million ($US 6.1 million) contract to supply thermal equipment for Railway Test & Research's new Vienna facility designed to study the st...
Related newspaper, magazine, and journal articles from HighBeam Research
|
Railway test & Research. (World Market).
International Railway Journal
; Sulzer-Escher Wyss, Germany, has won a DM 13 million ($US 6.1 million) contract to supply thermal equipment for Railway Test & Research's new Vienna facility designed to study the start-up and running performance of 250km/h high-speed trains under changing climatic conditions ranging from minus
|
|
Across asia: DPRK/ROK
China Daily
; Rail talks end without deal Talks between the Democratic People's Republic of Korea (DPRK) and the ROK on details of an agreement to conduct railway test runs across their heavily armed border ended inconclusively yesterday, the South said. The two sides had agreed early this month to conduct the
|
|
Alstom and Bombardier Transportation.(Brief Article)
International Railway Journal
; THE new railway test centre under construction in Valenciennes, France, is due to open in January 2000. There will be a high-speed test track, an endurance track, and a track to test driverless automatic systems. Alstom and Bombardier Transportation have set up a company to operate the centre,
|
|
French Authority for Rail Certification.(new testing facility opening in northern France)(Brief Article)
Railway Age
; A $25-million railway test center will open next January in the Nord-Pas-de-Calais section of northern France for qualification and batch testing of French and European supplier equipment, as well as equipment certification testing by the French Authority for Rail Certification. The 118-acre test
|
|
Sudden Change in Climate
The Washington Post
; It is alarming to hear Franklin Kameny {"Changed Climate Is Not Bad," letters, Aug. 19} give such a sunny assessment of the greenhouse effect. According to Mr. Kameny, the changes in climate resulting from the greenhouse effect are not to be dreaded: "Changed climate is not bad; it is just
|
|
Living with climate change in the Arctic.(Inuits)
World Watch
; In the late spring of 2000, a group of 52 hunters from Arctic Bay, a small Inuit community on the northern coast of Canada's Baffin Island, were hunting narwhal from the edge of the sea ice. But things didn't go according to plan, recalls Levi Barnabas, a 41-year-old hunter and local politician. A
|
|
ADB responds to climate change.(Business News)
Manila Bulletin
; The Asian Development Bank (ADB) is continuing to expand its efforts to respond to climate change, including increasing cooperation with the private sector to address the impact of changing climatic conditions on Asia and the world. ADB vice president Ursula SchA[currency]fer-Preuss stressed the
|
|
Test Section of High-Speed Railway System Confirmed by Foreign Experts.
Korea Times (Seoul, Korea)
; The Korea High Speed Rail Construction Authority (KHRC) said yesterday that foreign railway experts gave good marks to its high-speed railway test section which had been completed recently in the central part of the country. Eleven foreign experts took part in the evaluation of the 34.4-kilometer
|
|
TTCI and FRA set up train control test bed; TTCI and the Federal Railroad Administration are setting up a communications and train control test bed at the railway test centre in Pueblo, Colorado, United States. This will avoid the problems associated with testing a new system on a live railway.(Signalling & Telecoms)
International Railway Journal
; IF YOUR railway or development team is considering whether to implement a new communications system, a communications-based application, or a train control system, you probably have questions that need to be answered or concepts that require validation prior to committing to a particular system or
|
|
Response to comment by P.F. Doyle on "camp creek revisited: streamflow changes following salvage harvesting in a medium-sized, snowmelt-dominated catchment".
Canadian Water Resources Journal
; We thank P.F. Doyle for his interest in our recent paper. His comments identify two key issues: (1) the effect of including the most recent four years of data on our analyses; and (2) the validity of the paired-catchment analysis under changing climatic conditions. We will address these issues in
|