Sefid Rud or Safid Rud , river, c.450 mi (720 km) long, rising in NW Iran and flowing generally east to meet the Caspian Sea at Rasht. A storage dam on the river was completed in 1962. The Sefid Rud has cut a water gap through the Elburz Mts., capturing two headwater tributaries and widening the valley between the Talesh Hills and the main Elburz range. The gap provides a major route between Tehran and the Caspian lowlands.
Author not available, SEFID RUD.,
The Columbia Encyclopedia, Sixth Edition 2008
The Columbia Encyclopedia, Sixth Edition. Copyright 2008 Columbia University Press
For permission to reuse this article, contact Copyright Clearance Center.
|
IRAN: JOINT VENTURE CONSTRUCTION CONTRACT AWARD FOR PROPOSED $150,000,000 HYDRO POWER PROJECT, ELECTROWATT ENGINEERING SERVICES [SWITZERLAND], TABLIEH & FARAB [TURKEY] - Order #: 02102000.
WWP-Business Opportunities in Africa & the Middle East; 2/1/2000; 508 words;
... building a dam complex with an installed generating capacity of 165 Mw. The Ostour facility in question, to be sited on the Sefid Rud River adjacent Miyaneh, is expected to cost about $150,000,000 to complete. ELECTROWATT ENGINEERING, a subsidiary of ELECTROWATT ...
|
|
IRAN: JOINT VENTURE CONSTRUCTION CONTRACT AWARD FOR PLANNED $150,000,000 HYDROPOWER PLANT, ELECTROWATT ENGINEERING SERVICES [SWITZERLAND] & TABLIEH AND FARAB COMPANIES [IRAN] - order #: 042200.
WWP-Business Opportunities in Africa & the Middle East; 4/1/2000; 493 words;
... responsible for building a complex with an installed generating capacity of 165 Mw. The Ostour dam, to be sited on the Sefid Rud River adjacent Miyaneh, is expected to cost about $150,000,000 to complete. ELECTROWATT ENGINEERING, a subsidiary of ELECTROWATT ...
|
|
IRAN: JOINT VENTURE CONSTRUCTION CONTRACT AWARD FOR PLANNED $150,000,000 HYDROPOWER PLANT, ELECTROWATT ENGINEERING SERVICES [SWITZERLAND] & TABLIEH AND FARAB COMPANIES [IRAN] - order #: 042200.(Brief Article)
WWP-Report on Engineering Construct & Plant Operations in the Developing World; 4/1/2000; 493 words;
... responsible for building a complex with an installed generating capacity of 165 Mw. The Ostour dam, to be sited on the Sefid Rud River adjacent Miyaneh, is expected to cost about $150,000,000 to complete. ELECTROWATT ENGINEERING, a subsidiary of ELECTROWATT ...
|
|
Dying seas.
World Watch; 1/1/1995; Platt, Anne E.; 5758 words;
... just 18 years old and weighs 77 pounds. In the Iranian Sefid Rud River delta in the southern Caspian, the commercial catch ... early, and oil-covered seals and dophins made the nightly news, that--with tourist revenue at stake--the first actions ...
|
See all results from premium newspaper and magazine articles, images, maps and more at HighBeam Research.