Visit our new beta site!

Sefid Rud

From: The Columbia Encyclopedia, Sixth Edition  |  Date: 2008

Sefid Rud or Safid Rud , river, c.450 mi (720 km) long, rising in NW Iran and flowing generally east to meet the Caspian Sea at Rasht. A storage dam on the river was completed in 1962. The Sefid Rud has cut a water gap through the Elburz Mts., capturing two headwater tributaries and widening the valley between the Talesh Hills and the main Elburz range. The gap provides a major route between Tehran and the Caspian lowlands.

Author not available, SEFID RUD., The Columbia Encyclopedia, Sixth Edition 2008

Related articles from HighBeam Research:

IRAN: JOINT VENTURE CONSTRUCTION CONTRACT AWARD FOR PROPOSED $150,000,000 HYDRO POWER PROJECT, ELECTROWATT ENGINEERING SERVICES [SWITZERLAND], TABLIEH & FARAB [TURKEY] - Order #: 02102000.
WWP-Business Opportunities in Africa & the Middle East; 2/1/2000; 508 words; ... building a dam complex with an installed generating capacity of 165 Mw. The Ostour facility in question, to be sited on the Sefid Rud River adjacent Miyaneh, is expected to cost about $150,000,000 to complete. ELECTROWATT ENGINEERING, a subsidiary of ELECTROWATT ...
IRAN: JOINT VENTURE CONSTRUCTION CONTRACT AWARD FOR PLANNED $150,000,000 HYDROPOWER PLANT, ELECTROWATT ENGINEERING SERVICES [SWITZERLAND] & TABLIEH AND FARAB COMPANIES [IRAN] - order #: 042200.
WWP-Business Opportunities in Africa & the Middle East; 4/1/2000; 493 words; ... responsible for building a complex with an installed generating capacity of 165 Mw. The Ostour dam, to be sited on the Sefid Rud River adjacent Miyaneh, is expected to cost about $150,000,000 to complete. ELECTROWATT ENGINEERING, a subsidiary of ELECTROWATT ...
IRAN: JOINT VENTURE CONSTRUCTION CONTRACT AWARD FOR PLANNED $150,000,000 HYDROPOWER PLANT, ELECTROWATT ENGINEERING SERVICES [SWITZERLAND] & TABLIEH AND FARAB COMPANIES [IRAN] - order #: 042200.(Brief Article)
WWP-Report on Engineering Construct & Plant Operations in the Developing World; 4/1/2000; 493 words; ... responsible for building a complex with an installed generating capacity of 165 Mw. The Ostour dam, to be sited on the Sefid Rud River adjacent Miyaneh, is expected to cost about $150,000,000 to complete. ELECTROWATT ENGINEERING, a subsidiary of ELECTROWATT ...
Dying seas.
World Watch; 1/1/1995; Platt, Anne E.; 5758 words; ... just 18 years old and weighs 77 pounds. In the Iranian Sefid Rud River delta in the southern Caspian, the commercial catch ... early, and oil-covered seals and dophins made the nightly news, that--with tourist revenue at stake--the first actions ...

See all results from premium newspaper and magazine articles, images, maps and more at HighBeam Research.

Browse by alphabet: